Autumn Action Day – Clearance work at Beech Bottom Dyke

actionday2_161016

Despite heavy rain on the morning of Sunday 16th October, an intrepid group of volunteers were able to clear large areas of brambles adjacent to the path on the southern side of the Dyke.  This clearance work not only makes the the path more accessible, but gives clear views to the bottom of the Dyke. It may also provide more ventilation to the Dyke and reduce its boggy nature at certain points.

This is part of an of an ongoing attempt to make the this neglected ancient earthwork more accessible to walkers and other interested parties.

actionday3_161016

Some of the brambles and other small branches have now been cleared.

bbd_arisings

There is a pile of small logs by the top path about midway between the Ancient Briton and the entrance near the junction of Beech and Firbank Roads. Help yourself.  Most of the wood is elder and not yule log material, but split and dried would make good kindling.  Photo: RM

Posted in Action Days, Beech Bottom Dyke

News and Links

fobh_logo_button    facebook_logo    twitter_logo
Recent Updates
Newsletter Spring 2017

A Guide to Beech Bottom Dyke
by Peter Burley
Missing display board
June 2017
Missing board - Townsend drive
If you missed this interpretation board recently, the legs rotted and it is in for repair


Poppies June 2017
Now appearing on the Heath
Poppies, perhaps brought in with the soil used on the Lower Field after the sinkhole event.
Photo: PB

Ariston link
join_us 2017 subscriptions now due

FoBH MugsMugs available from the Heath Bakery (Londis) at £5 each

newsletter_sample More Links