Farewell to the temporary road

removal_of_temp_road

Work on the removal of hundreds of tons of sand and hardcore which made up the road across the Lower Field has been going ahead this week and it looks as if it will be completed next week beginning 30th January.   Material is being transported to the old fire station yard before removal from the site.

After a week of cold but sunny weather, fog has come to give us this ethereal view of operations

removal_of_temp_road4

Photo: PB

removal_of_temp_road3

What remains after removal of the road.

If you are walking in the area, its worth noting that the usual entrances to the field, including this one, are closed while operations continue. Tough for the dog.

2017-01-23-15.59.08

Photo: MN

 

Posted in Ariston site, Fontmell

News and Links

fobh_logo_button    facebook_logo    twitter_logo
Recent Updates
Newsletter Spring 2017

A Guide to Beech Bottom Dyke
by Peter Burley
Missing display board
June 2017
Missing board - Townsend drive
If you missed this interpretation board recently, the legs rotted and it is in for repair


Poppies June 2017
Now appearing on the Heath
Poppies, perhaps brought in with the soil used on the Lower Field after the sinkhole event.
Photo: PB

Ariston link
join_us 2017 subscriptions now due

FoBH MugsMugs available from the Heath Bakery (Londis) at £5 each

newsletter_sample More Links